$271,341.00

Project Type

Federal

Project Procurment

Design-Bid-Build

Project Description: The project involved the procurement and installation of a pre-manufactured metal storage building, approximately 50 feet long, 20 feet wide, and 18 feet high, located within the secured perimeter of Building V-58. The new structure was designed and installed to provide dedicated storage for a collimation tower, ensuring both accessibility and protection within the existing facility layout.

Work included installing structural connections to securely anchor the building and counteract potential uplift forces, thereby maintaining long-term stability under varying environmental conditions. The project also included installing both interior and exterior lighting systems to support safe and efficient use of the storage space.